Entrance Upgrade
ENTRANCE UPGRADE.
Corpus Christi Catholic High School, Oak Flats, NSW
This project involved the demolition of the existing concrete and tile entrance, due to cracked tiles and the dropped slab levels. Works involved removing a section to prepare ground and base material for new mesh reinforcement in preparation for new concrete resurfacing.